In this week's production day we went over the pre-production roles that everyone had been assigned to ensure that they had all been done. We then continued to design the set and lighting to ensure that we were all happy with it. Everyone split off into different roles so that we could get everything done asap and once we came back from a break, we decided to try and run through the show. This was disastrous at first as nobody really knew what they were doing, but by the end of the session we had managed to get a full timings schedule for the PA and confirm an external presenter which meant that all in all we had a successful session.
We have got the studio booked from 2pm-12am the day before our assessment as well, which will be extremely helpful for the final run-through's (to ensure it'll run smoothly on the day) and so our presenter can meet everyone and get comfortable with the script.